City of Clearwater crews chipped out aging concrete Monday on North Hillcrest Avenue and replaced it with permeable pavement, a porous surface designed to let rainwater drain into the ground instead of pooling on the street.
Ali Ismailoski, right-of-way division manager for the city’s Public Works Department, said the product is structurally sound and allows water to flow through it and return to the earth. He said it relieves pressure on the stormwater system and helps the city eliminate ponding “wherever we can.”
The Hillcrest location had a persistent problem. Bernard Wigfals, the city’s streets and sidewalks supervisor, said water kept collecting there and would not drain. Ismailoski said crews had few other options for changing the flow line, which made the spot a strong candidate for the material.
The city has also used the pavement around a tree in Countryside, which allowed crews to avoid removing as much root material from the tree’s critical root zone.
The program is still small. Clearwater began installing permeable pavement about a year ago and has laid roughly 1,000 square feet. Project cost figures were not available at publication.
Maintenance may be the larger question. The U.S. Environmental Protection Agency lists clogging as a concern with permeable surfaces because it can limit how quickly water soaks in. Long-term upkeep costs are a fair question for ratepayers if the city expands its use.
The project comes weeks after Florida voters approved Amendment 3 with about 62% of the vote. The measure expands non-school homestead exemptions beginning in 2027 and puts a premium on stretching every public dollar.
Follow the St. Pete-Clearwater Sun on Facebook, Google, & X
St. Pete-Clearwater Sun: local St. Pete-Clearwater & Tampa Bay, FL news at PIE-Sun.com